LIS Analytics™

Forensic Electrical Engineering | Grid Observability at Sub-Cycle Resolution

mica@lisanalytics.net | (610) 835-6556 | lisanalytics.net
SAM.gov UEI: H5F3VN9LME86 | CAGE: 1Z957 | WOSB Certified — June 4, 2026

Forensic Look-Back Assessment

Find the capacity you already own — using your own historical data. No software installation. No IT security exposure. No operational risk.

Patent Pending — USPTO 64/027,496 WOSB Certified SAM.gov Active IEEE 519-2022 Grounded NERC Reliability Guideline Aligned
What the Client Provides
  • 30 days of historical waveform or interval data in CSV or COMTRADE format
  • Completed LIS Analytics client intake form: facility location, sector, peak demand (kW), utility rate
What This Is Not
  • Live software deployment or installation
  • Protection relay coordination study
  • Pre-deployment simulation or predictive model
  • Guarantee of specific savings figures
Who Should Request This
  • Federal facility energy managers — military, DOE, GSA facilities
  • ESCO prime contractors holding ESPC contracts
  • University physical plant directors — campuses with significant computational loads
  • Data center CCOs preparing for NERC CLE registration
  • Utilities with suspected high-harmonic nodes or unexplained equipment degradation
  • Harmonic content analysis — 1st–11th harmonics, voltage and current THD, IEEE 519-2022 compliance assessment at the point of interconnection
  • Equipment stress indices — transformer K-factor, neutral conductor thermal stress, and capacitor bank voltage stress computed automatically across all phases in a single CSV pass
  • Sub-cycle transient detection — voltage sags, swells, and current surges not visible in conventional 15-minute SCADA interval data
  • Rate of Change of Frequency (RoCoF) profile — grid stability margin conditions at your node
  • Findings narrative — engineering assessment identifying hidden stress conditions, capacity waste, or regulatory compliance exposure specific to your facility
  • Methodology documentation referencing IEEE 519-2022 and NERC Reliability Guideline: Risk Mitigation for Emerging Large Loads (May 2026)
Commercial / Data Center / Utility Track
Single Node Forensic Look-Back Assessment15 business day turnaround
$5,000
Multi-Node Comparative Assessment (up to 3 nodes)20 business day turnaround
$35,000
Federal / ESPC Track — GPC Eligible
Tier 1 — Full Forensic Assessment15 business day turnaround
$9,500
Tier 2 — Assessment + M&V Baseline+ 15% of verified Year 1 savings
$7,500
Tier 3 — Multi-Year Partnership+ 18% of verified savings over 3 years
$2,500
Regulatory Tailwind
  • FERC RM26-4 — large load interconnection (>20 MW) committed to commission-level action June 2026, addressing reliability, cost allocation, and standardization gaps
  • NERC Level 3 Essential Actions Alert (May 2026) — highest urgency tier — registered entities must respond by August 3, 2026
  • NERC Reliability Guideline (May 2026) explicitly identifies harmonic injection spectrum at the point of interconnection as a current measurement gap in existing industry practice
Ready to see what your grid data is hiding?
Contact us to discuss your data and scope.
Request an Assessment →

Patent Pending — USPTO Application 64/027,496 · Copyright Registered — Case 1-15137906721 · SAM.gov Active — UEI: H5F3VN9LME86 · CAGE: 1Z957 · WOSB Certified

MCT Global Enterprises LLC · mica@lisanalytics.net · lisanalytics.net | Privacy PolicyTerms of ServiceInsightsServices

(610) 835-6556