LIS Analytics™
Forensic Electrical Engineering | Grid Observability at Sub-Cycle Resolution
mica@lisanalytics.net | (610) 835-6556 | lisanalytics.net
SAM.gov UEI: H5F3VN9LME86 | CAGE: 1Z957 | WOSB Certified — June 4, 2026
SAM.gov UEI: H5F3VN9LME86 | CAGE: 1Z957 | WOSB Certified — June 4, 2026
Forensic Look-Back Assessment
Find the capacity you already own — using your own historical data. No software installation. No IT security exposure. No operational risk.
Patent Pending — USPTO 64/027,496
WOSB Certified
SAM.gov Active
IEEE 519-2022 Grounded
NERC Reliability Guideline Aligned
What the Client Provides
- 30 days of historical waveform or interval data in CSV or COMTRADE format
- Completed LIS Analytics client intake form: facility location, sector, peak demand (kW), utility rate
What This Is Not
- Live software deployment or installation
- Protection relay coordination study
- Pre-deployment simulation or predictive model
- Guarantee of specific savings figures
Who Should Request This
- Federal facility energy managers — military, DOE, GSA facilities
- ESCO prime contractors holding ESPC contracts
- University physical plant directors — campuses with significant computational loads
- Data center CCOs preparing for NERC CLE registration
- Utilities with suspected high-harmonic nodes or unexplained equipment degradation
What LIS Analytics Delivers — Written Forensic Assessment Report
- Harmonic content analysis — 1st–11th harmonics, voltage and current THD, IEEE 519-2022 compliance assessment at the point of interconnection
- Equipment stress indices — transformer K-factor, neutral conductor thermal stress, and capacitor bank voltage stress computed automatically across all phases in a single CSV pass
- Sub-cycle transient detection — voltage sags, swells, and current surges not visible in conventional 15-minute SCADA interval data
- Rate of Change of Frequency (RoCoF) profile — grid stability margin conditions at your node
- Findings narrative — engineering assessment identifying hidden stress conditions, capacity waste, or regulatory compliance exposure specific to your facility
- Methodology documentation referencing IEEE 519-2022 and NERC Reliability Guideline: Risk Mitigation for Emerging Large Loads (May 2026)
Commercial / Data Center / Utility Track
Single Node Forensic Look-Back Assessment15 business day turnaround
$5,000
Multi-Node Comparative Assessment (up to 3 nodes)20 business day turnaround
$35,000
Federal / ESPC Track — GPC Eligible
Tier 1 — Full Forensic Assessment15 business day turnaround
$9,500
Tier 2 — Assessment + M&V Baseline+ 15% of verified Year 1 savings
$7,500
Tier 3 — Multi-Year Partnership+ 18% of verified savings over 3 years
$2,500
