Stop Overpaying for Capacity You’re Not Using
Most federal facilities waste $300K–$800K annually on inflated demand charges. We find it. You keep it. No capital investment required.
How We Find What Standard Audits Miss
Traditional energy audits measure consumption. We measure distribution. Our patent-pending LIS™ Engine identifies structural inefficiencies embedded in your electrical architecture — wasted capacity you’re already paying for but not using.
Analyze Your Data
We review 12 months of utility bills and distribution network characteristics
Identify Ghost Loads
Our forensic engine finds permanent demand overcharges standard meters can’t detect
Quantify Savings
You get defensible calculations ready for ESPC performance contracts
Verify Results
Optional ongoing monitoring ensures savings persist and compounds over time
Choose Your Engagement Level
Flexible pricing designed for federal acquisition. All tiers are credit card purchasable under the Simplified Acquisition Threshold.
Quick Scan
Prove we can find savings before you commit.
48-hour analysis of your utility data. We identify 2-3 high-probability savings opportunities and estimate their annual value. If you upgrade to a Full Assessment within 30 days, the $2,500 is fully credited.
What You Get:
- 12 months of utility bill analysis
- Top 3 savings opportunities identified
- Estimated annual value for each finding
- Recommendation: proceed or not
- Full credit toward Tier 1 if upgraded within 30 days
Full Forensic Assessment
Complete diagnostic. Every inefficiency quantified.
Our complete 14-section LIS™ Engine analysis identifies every structural inefficiency in your distribution network. You get quantified savings, prioritized recommendations, and an implementation roadmap.
What You Get:
- Complete 14-section forensic report
- Permanent Load Reduction (PLR) quantification
- Network Stress Index (NSI) analysis
- NERC CLE compliance assessment
- Prioritized implementation roadmap
- Estimated savings by intervention
Assessment + M&V Baseline
Lower upfront cost. We get paid when you save.
Everything in the Full Assessment, plus a one-year M&V baseline compliant with ASHRAE Guideline 14 and IPMVP Option B. We verify savings quarterly. You only pay the performance fee when savings are proven.
What You Get:
- Everything in Tier 1 Full Assessment
- ASHRAE GL-14 / IPMVP Option B M&V baseline
- Quarterly savings verification reports (4 total)
- Performance fee only on verified savings
- ESPC performance bond documentation
Multi-Year Partnership
Lowest upfront. Maximum alignment.
Complete assessment, M&V baseline, and three years of quarterly Persistence Score™ monitoring. We track savings, verify performance, and provide annual optimization recommendations.
What You Get:
- Everything in Tier 1 Full Assessment
- ASHRAE GL-14 / IPMVP Option B M&V baseline
- Quarterly Persistence Score™ updates (12 total)
- Quarterly savings verification reports
- Annual optimization recommendations (3 total)
- Performance fee only on verified savings
Compare Engagement Tiers
| Feature | Quick Scan $2,500 |
Full Assessment $7,500 |
M&V Baseline $4,500 + 15% |
Partnership $2,500 + 18% |
|---|---|---|---|---|
| Delivery Timeline | 48 hours | 10 days | 10-25 days | 10-25 days |
| Savings Identification | Top 3 opportunities | All opportunities | All opportunities | All opportunities |
| Full 14-Section Report | — | ✓ | ✓ | ✓ |
| M&V Baseline | — | — | ✓ | ✓ |
| Savings Verification | — | — | Quarterly (1 year) | Quarterly (3 years) |
| Performance Fee | None | None | 15% Year 1 | 18% over 3 years |
| Credit Card Purchasable | ✓ | ✓ | — | — |
| Best For | Proof of concept | Comprehensive audit | ESPC preparation | Long-term optimization |
Frequently Asked Questions
How is this different from a standard energy audit?
Standard audits measure consumption — how much energy you use. We measure distribution — how efficiently your network delivers that energy. Our forensic analysis identifies structural inefficiencies in your electrical architecture that conventional meters can’t detect. These are permanent demand overcharges you’re paying for capacity you’re not actually using.
What data do you need from me?
For the Quick Scan: 12 months of utility bills (PDF or CSV). For the Full Assessment: utility bills plus basic facility information (square footage, primary loads, distribution voltage). We’ll provide a detailed data request checklist upon engagement.
Is this eligible for federal procurement?
Yes. Tiers 0 and 1 are under the Simplified Acquisition Threshold and credit card purchasable. Tiers 2 and 3 are structured for ESPC compatibility with ASHRAE GL-14 and IPMVP Option B compliant M&V documentation. We’re SAM.gov registered (UEI: H5F3VN9LME86) and WOSB certified.
What if you don’t find significant savings?
For the Quick Scan ($2,500), you’re only out that initial investment. For Tiers 2 and 3, our performance fee is tied to verified savings — if we don’t find it, we don’t get paid beyond the modest upfront fee. Our incentives are aligned with your results.
Can I start with a Quick Scan and upgrade later?
Yes. If you upgrade to the Full Assessment (Tier 1) within 30 days of your Quick Scan delivery, the $2,500 is fully credited. You only pay the difference ($5,000).
Ready to Find Your Hidden Capacity?
Most federal facilities are overpaying by $300K-$800K annually. Prove we can find it for $2,500.
Questions? mica@lisanalytics.net or call (610) 835-6556
