Pricing note: All fees are quoted at time of engagement and confirmed in a written Engagement Agreement. Performance fees apply only to verified savings as defined by ASHRAE Guideline 14 and IPMVP Option B protocols.

LIS Analytics — Engagement Tiers

Forensic Electrical Engineering Analysis — Services & Pricing

Three market tracks. One methodology. Patent-pending sub-cycle forensic observability for data centers, utilities, and federal facilities — each with pricing designed for that market’s decision cycle and risk tolerance.

1 kHzSub-cycle resolution
22-tabAnalytical framework
IEEE13-Node validated
WOSBCertified

Commercial Track — Data Centers & Utilities

Data Centers & Utilities

Hyperscale AI data centers and utility operators face sub-cycle transient threats that 15-minute SCADA systems cannot detect. GPU cluster initialization events, harmonic resonance, and neutral conductor thermal stress cause equipment failures and unplanned outages. The LIS Engine identifies these phenomena in real time — before failure occurs.

Rapid Grid Assessment
$5,000
One-time · 15 business day delivery
Sub-cycle snapshot analysis at your Point of Common Coupling. Identifies harmonic distortion, transient event patterns, and equipment stress conditions your SCADA cannot see.
  • 1 kHz harmonic spectrum analysis (1st–11th harmonics)
  • Transient event detection and timestamping
  • Equipment stress index snapshot (transformer, neutral, capacitor)
  • IEEE 519-2022 compliance gap assessment
  • Preliminary findings report
  • Full credit toward Infrastructure Assessment if upgraded within 30 days
⚡ 15 business day delivery  ·  💳 Card purchasable
Request Rapid Assessment
Ongoing Monitoring
By scope
Available following Infrastructure Assessment
Continuous sub-cycle monitoring at strategic PCCs. Equipment stress index tracking, transient event logging, and quarterly forensic reports — the operational layer your SCADA cannot provide.
  • Periodic 1 kHz assessment at PCC
  • Equipment stress index analysis per assessment cycle.
  • Transient event detection and logging
  • Monthly harmonic compliance reports
  • Quarterly forensic analysis reports
  • Annual optimization recommendations
📅 Annual contract  ·  📈 Quarterly reporting  ·  Pricing by facility scope
Discuss Monitoring Scope

Federal Track — ESPC & Performance Contracting

Federal Facilities & ESPC

All federal tiers fall under the Simplified Acquisition Threshold and are credit card purchasable. ASHRAE GL-14 and IPMVP Option B compliant M&V documentation included in Tiers 2 and 3. SAM.gov registered · WOSB certified · UEI: H5F3VN9LME86.

Quick Scan
$2,500
One-time · 15 business day delivery · Fully creditable toward Tier 1
12 months of utility billing data and facility interval data in CSV or COMTRADE format. Identifies 2–3 high-probability savings opportunities with estimated annual value. Full credit toward Tier 1 if upgraded within 30 days.
  • 12 months utility bill analysis
  • Top 3 savings opportunities identified
  • Estimated annual value per finding
  • Proceed / don’t proceed recommendation
  • Full credit toward Tier 1 within 30 days
⚡ 15 business day delivery  ·  💳 Government credit card purchasable
Request Quick Scan
Assessment + M&V Baseline
$4,500
+ 15% of verified Year 1 savings · 12-month term
Everything in the Full Assessment plus a one-year ASHRAE GL-14 / IPMVP Option B compliant M&V baseline with quarterly savings verification. Performance fee only on verified savings.
  • Everything in Full Forensic Assessment
  • ASHRAE GL-14 / IPMVP Option B M&V baseline
  • Quarterly savings verification reports (4 total)
  • Performance fee on verified savings only
  • ESPC performance bond documentation
📅 12-month term  ·  📈 Quarterly verification  ·  🤝 Aligned incentives
Example: $300K savings = $4,500 + $45,000 Year 1 total
Request M&V Package
Multi-Year Partnership
$2,500
+ 18% of verified savings over 3 years
Complete assessment, M&V baseline, and three years of quarterly Persistence Score™ monitoring with annual optimization recommendations. Lowest upfront. Maximum alignment.
  • Everything in Full Forensic Assessment
  • ASHRAE GL-14 / IPMVP Option B M&V baseline
  • Quarterly Persistence Score™ updates (12 total)
  • Quarterly savings verification (12 total)
  • Annual optimization recommendations (3 total)
  • Performance fee on verified savings only
📅 36-month term  ·  🎯 Annual optimization
Example: $300K savings = $2,500 + $162,000 over 3 years
Request Partnership

Partner Track — ESCOs & Prime Contractors

ESCO & Prime Contractor Partnerships

Add LIS Engine forensic methodology to your existing ESPC offers. We provide the methodology and analysis; you bring the client relationship.

Subcontract Analysis
$5,000–$15,000
Per facility · Based on scope
LIS Analytics performs the forensic analysis as a subcontractor to your ESPC engagement. You receive a white-label forensic report suitable for inclusion in your prime contract deliverables.
  • Full LIS Engine forensic analysis
  • White-label report format available
  • ESPC-defensible savings calculations
  • ASHRAE GL-14 / IPMVP Option B compliant
  • Government data provenance audit trail
Discuss Subcontract Terms
Portfolio Licensing
By portfolio size
Annual license · Unlimited analyses
Annual license for large ESCOs or prime contractors deploying LIS Engine methodology across a portfolio of facilities. Pricing based on annual analysis volume. Contact for terms.
  • Unlimited facility analyses per license year
  • LIS Engine methodology license
  • Training and onboarding included
  • Dedicated support contact
  • Co-marketing opportunities available
📅 Annual term  ·  Volume-based pricing
Discuss Portfolio License

Feature comparison

Compare Federal Tiers

Feature Quick Scan $2,500 Full Assessment $9,500 M&V Baseline $4,500+15% Partnership $2,500+18%
Delivery timeline 15 day 15 days 15–25 days 15–25 days
Savings identification Top 3 All All All
Full 14-section report
NERC CLE documentation
M&V baseline (ASHRAE GL-14)
Savings verification Quarterly · 1 year Quarterly · 3 years
Performance fee None None 15% Year 1 18% over 3 years
Credit card purchasable
ESPC performance bond ready

Common questions

Frequently Asked Questions

How is this different from a standard energy audit?
Standard audits measure consumption — how much energy you use. We measure distribution — how efficiently your network delivers that energy at sub-cycle resolution. Our 1 kHz forensic analysis identifies structural inefficiencies that 15-minute SCADA systems and conventional meters structurally cannot detect: harmonic distortion, neutral conductor thermal stress, capacitor bank resonance, and transient demand spikes that trigger ratchet clause exposure.
What data do you need?
For the Quick Scan and federal tiers: 12 months of utility billing data and facility interval data in CSV or COMTRADE format plus basic facility information. For the commercial Infrastructure Assessment: utility bills, facility load profile, and Submitted facility data in CSV or COMTRADE format — no on-site instrumentation required. We provide a detailed data request checklist upon engagement confirmation.
Is this eligible for federal procurement?
Yes. The Quick Scan ($2,500) and Full Forensic Assessment ($9,500) both fall under the Simplified Acquisition Threshold and are purchasable via government purchase card. Tiers 2 and 3 are structured for ESPC compatibility with ASHRAE GL-14 and IPMVP Option B compliant M&V documentation. LIS Analytics is SAM.gov registered (UEI: H5F3VN9LME86) and WOSB certified.
What if you don’t find significant savings?
For the Quick Scan, you’re only out the initial $2,500 investment. For Tiers 2 and 3, our performance fee is tied exclusively to verified savings — if we don’t find it, we don’t charge beyond the modest upfront fee. For data center and utility engagements, preliminary findings are delivered before full payment is due.
Can I start with a Quick Scan and upgrade?
Yes. The Quick Scan fee is fully credited toward the Full Forensic Assessment if you upgrade within 30 calendar days of delivery. This is the recommended path for new federal engagements — prove value first, then commit to the full analysis.
Is the methodology validated?
Yes. The LIS Engine methodology is validated against the IEEE 13-Node radial distribution test feeder (Newton-Raphson power flow convergence: 4.2×10⁻⁷ pu). The methodology is patent-pending (USPTO Application 64/027,496, filed April 3, 2026). All analytical outputs are parameterized from published IEEE load profiles and U.S./Canadian government databases.

Ready to Start?

Every engagement begins with a conversation. Tell us about your facility and we’ll recommend the right tier for your situation.

Request a Consultation

Patent Pending — USPTO Application 64/027,496 · Copyright Registered — Case 1-15137906721 · SAM.gov Active — UEI: H5F3VN9LME86 · CAGE: 1Z957 · WOSB Certified

MCT Global Enterprises LLC · mica@lisanalytics.net · lisanalytics.net | Privacy PolicyTerms of ServiceInsightsServices

(610) 835-6556